Product description

Fescon SILKO Rapid Corro C35/45 3mm is a special plaster for demanding casting applications

  • SILKO-approved (24 Aug 2012)
  • Compressive strength C35/45
  • Rapid hardening and drying
  • Easy to compact
  • Good salt-frost resistance
  • Good adhesive properties
  • Very slow carbonation

Applications

  • Bridges, harbours and parking garages
  • Horizontal surfaces such as stairs and floors
  • Adding a protective concrete shield
  • Exposure classes XF4 and XC4
Vinkki! Vieritä taulukkoa sivuttain
EAN code Product name Product number Package size
6416841333056 SILKO RAPID CORRO SPC C 35/45 33305 1000 kg
6416841533050 SILKO RAPID CORRO SPC 35/45 53305 25 kg

Instructions

Total water requirement is around 2.5 l/25 kg of dry product. Add the dry material to the water and mix with a power mixer for around one to two minutes; allow to stand for five minutes and mix again for a short while. Find the final consistency at this stage by adding water when necessary. However, keep the total amount of water at around 10% of the dry product. The finished plaster remains workable for around one hour.

The base must be undamaged, clean, rough and damp enough to be darker in colour. There must be no cement paste on the surface. Begin wetting the base on the previous day. The required amount of wetting depends on the weather conditions and, for instance, the strength of the base. You must always ensure that there is no standing water on the base when starting rendering. If necessary, use Fescon Adhesive Plaster.

Adhesion to the base concrete is ensured through careful compacting and, if necessary, by applying a separate adhesion layer on the base with a brush. Do not allow the adhesion layer to dry before spreading the plaster. If necessary, use Fescon Adhesive Plaster. The thickness of a casting layer spread at one time is around 10 to 50 mm. When doing thicker casts, leave the lower layer rough so that adhesion between casting layers is as good as possible. The lowest working temperature is +5°C. The mass and base must always be at a temperature of at least +5°C.

The aftercare must be begun immediately after the plaster has been spread and must continue for at least seven days. We recommend using plastic covering / curing compound and a hood. The aftercare is stopped in stages. When doing extensive surface casting, you must pay special attention on not only aftercare but also the preparation of the base and the casting work itself to avoid cracks.

Waste handling

Hardened product and empty, dry packages can be delivered to a landfill. Liquid product must be delivered to a hazardous waste reception point.

Technical information

Material usage

50 mm layer 90 kg/m2.

Water requirement approx. 2.5 l / 25 kg
Finished compound 11 - 12 l / 25 kg bag
Type powder
Colour grey
Composition Portland cement, natural sand, and additives improving workability, weather resistance and compactness.
Maximum grain size

3 mm

Package size 25 kg and 1000 kg
Storage

storage time in a dry location approx. 1 year

Lowest usage temperature

+ 5°C

Workability time 1 h
Drying time

Rh < 90% approx. 7 days (T 20 C, Rh 50%, w/ water amount < 10%)

Strength class C 35/45
Compressive strength

K 45

Adhesion strength

> 2 MPa

Strength development

1 day ~20 MPa

7 days ~40-45 MPa

28 days ~45-50 MPa

Carbonation

0 mm (according to the Silko test programme)

Frost resistance Adhesion strength > 2 MPa (no cracking, erosion or lamination)

References

Other links

The information is based on tests and practical experience. We cannot affect conditions at the work site so we cannot assume responsibility for the end result affected by local conditions.