Grouting concrete TJB Winter

Ask for more information

Product description

Fescon Grouting Concrete Winter is a special concrete that expands before setting. Casting work will succeed in winter at temperatures as low as -15oC. 

  • Strength class C 40/50 (28 days at -5°C + 28 days at +2°C)
  • No chlorides
  • Good workability
  • Excellent casting properties
  • Low drying shrinkage

Applications

  • Jointing of prefabricated elements
  • Grouting of municipal engineering connections
  • Grouting
  • Anchor casting
The product is listed in the portal for building products that can be used in Nordic Swan Ecolabelled buildings.
GTIN code Product name Product number Package size
6416841530141 Grouting concrete TJB Winter 53014 25 kg
6416841330147 GROUTING CONCRETE TJB WINTER 33014 1000 kg
Base

The base must be undamaged, clean, and damp enough to be darker in colour. Snow and ice must be melted away from the base. If necessary, also remove the weak-strength cement paste layer. Best adhesion can be achieved to a rough base. The mould must be tight, because Fescon Grouting Concrete Winter is pliable and flows easily while it is workable. When using galvanised steels, you must make absolutely sure that the coating has become passive.

Mixing

Refer to the bag for how much water the concrete requires. Add the dry material to the water and mix with a concrete mixer for around three to five minutes. With a power mixer, around two to three minutes of mixing is sufficient. Let the mass stand for a while and mix it again for a short while. Find the correct consistency at this stage by gradually adding the rest of the water. We do not recommend adding all of the water right at the start. If you are unable to use the concrete immediately after mixing, we recommend mixing it again before casting. The finished concrete remains workable for around half an hour. If several bags are mixed at the same time, the heat from the hydration reaction can shorten the workability time. We recommend mixing one or two bags at a time.

Work instructions

Casting should be done as soon as possible after mixing. If necessary, vibrate the casting lightly or ram it. The recommended casting layer thickness is 15-100 mm. Follow the instructions of the designers and the official regulations on winter concreting when doing casting work.

After treatment

The fresh casting must be protected from snow and rain. You must care for the casting with, for example, a plastic cover or curing compounds. The aftercare should continue for around 7 days. Strength development continues without additional heating in temperatures above -15°C.

Other points to note 

Winter products will be available in the winter season, from 15 September to 1 March. At other times, the products must be ordered separately.

Storage and handling of waste
See the separate storage and disposal instructions https://www.fescon.fi/en/material-bank

Water requirement 3.5 - 4.0 l/25 kg of dry material
Finished compound 11-12 l/25 kg of dry material
Composition portland cement, natural sand (max. grain size 3.0 mm), and additives that make the fresh mass expand, improve workability and ensure strength development in freezing temperatures.
Package size 25 kg and 1000 kg
Storage

approx. 8 months in a dry location

Lowest usage temperature

- 15°C

Workability time approx. 0.5 h
Plasticity approx. 1 sVB
Mixing ratio approx. 3 h
Strength class C 40/50
Strength development

strength development with a water amount of 3.8 l/25 kg of dry material (prism strength)

Volume change < +5 %
Reaction to fire A1
Exposure class XC 4, XD 3, XS 3,XF 1, XA 1