Installation
- Spread the waterproofing compound into the corners, where two elements meet, and into through-holes. The waterproofing accessories are attached to the wet waterproofing compound. Spread the waterproofing compound thoroughly over the strengthening strips using a brush or roller. Make sure that the strips are fully attached to the waterproofing compound below, with no exposed parts. The strengthening strips must be between two waterproofing compound layers.
Other points to note
- Through-holes can also be made using waterproofing strip 0.15 x 25 m or waterproofing membrane. A waterproofing strip can be used for through-holes with a maximum diameter of 75 mm. Any larger through-holes are made using waterproofing membrane or a drain flange 300 x 300 fibre product. A ready-made drain flange must be used for drains.
- Waterproofing is carried out in accordance with RT cards and RIL guidelines.
Storage and handling of waste
See the separate storage and disposal instructions https://www.fescon.fi/en/material-bank